BAA Heathrow Terminals 1 and 3

  • Mechanical Services consultants for the new T1 chillers and cooling towers.
  • Software modelling to underpin infrastructure development strategy.
     

BAA Heathrow Terminals 2 and 4

  • Trouble shooting and system performance surveys.
  • Developed strategy for new chillers and cooling towers.
     

BAA Heathrow Terminal 5

  • Design of heat recovery for T5 CHP plant to provide 13MW of heating.
     

BAA Stansted

  • Plant optimisation for centralised chilled water and LTHW identified 1,000 tonnes of annual CO2 reduction
     

BAA Southampton

  • Condition surveys of centralised boilers and chillers and development of replacement plans.
     

London Gatwick Airport

  • Modelled high-temperature hot water (HTHW) and chilled water to identify system improvements and managed necessary modifications.
 
 