BAA Heathrow Terminals 1 and 3:

  • Power Plan Services were Mechanical Services consultants for the new T1 chillers and cooling towers.
  • We used the software model to underpin medium term infrastructure development strategy. This resulted in a £10m investment project in chillers, distributed pipe work and capacity development.
     

BAA Heathrow Terminals 2 and 4

  • Trouble shooting and system performance surveys.
  • Developed strategy for new chillers and cooling towers.
     

BAA Heathrow Terminal 5:

  • Design of heat recovery for T5 CHP plant to provide 13MW of heating.
     

BAA Gatwick:

  • Modelled high-temperature hot water (HTHW) and chilled water to identify system improvements and managed implementation of changes.
     

BAA Stansted

  • Plant optimisation for centrlaised chilled water and LTHW identified 1,000 tonnes of annual CO2 reduction.