| | BAA Heathrow Terminals 1 and 3 - Mechanical Services consultants for the new T1 chillers and cooling towers.
- Software modelling to underpin infrastructure development strategy.
BAA Heathrow Terminals 2 and 4 - Trouble shooting and system performance surveys.
- Developed strategy for new chillers and cooling towers.
BAA Heathrow Terminal 5 - Design of heat recovery for T5 CHP plant to provide 13MW of heating.
BAA Stansted - Plant optimisation for centralised chilled water and LTHW identified 1,000 tonnes of annual CO2 reduction
BAA Southampton - Condition surveys of centralised boilers and chillers and development of replacement plans.
London Gatwick Airport - Modelled high-temperature hot water (HTHW) and chilled water to identify system improvements and managed necessary modifications.
| | |